PAST PROJECTS

  

Islander Middle School
Contract Amount: $TBD
Outside Plant Improvements - Monroe Correctional Complex
Contract Amount: $2,266,401

This project included new communications backbone raceway and required excavation, backfill and restoration of landscaping and hardscapes both in and outside the maximum security facility as well as incidental storm drainage work.

DoIT Radio Transmitter Building
Contract Amount: $1,274,517
Complete demolition existing building and foundation including soil remediation; construction of new 713 SF masonry structure and exterior cable tray to radio tower; upgraded electrical service and mechanical system to meet necessary requirements for this type of building. 
Fishermen's Terminal C-15 Building HVAC Replacement
Contract Amount: $3,068,350
Upgrade HVAC system replacing rooftop units ranging from 2.5 to 30 tons with new high efficiency rooftop heat pumps and variable air volume systems.  New high efficiency heat pumps, air units, ceiling removal and replacement; replacement of HVAC controls and wiring, new electrical panels, disconnects and wiring to support new HVAC equipment; lead paint abatement in air handlers.
PWC Local Lynnwood Office
Contract Amount: $15,568,894
Demolition of existing 33,500 SF metal warehouse and office building.  Construct 1-story 29,580 SF operations and maintenance facility; a 1-story 1,695 SF vehicle wash station; and a 1-story 5,100 SF covered vehicle storage building.  All buildings are structural steel frame and concrete tilt construction, fully sprinkled buildings.
Mt Si High School FLC Administration Area
Contract Amount: $108,600
Modification including demolition and construction of new furred walls and finishes, new suspended ceiling system; included mechanical, plumbing, electrical, and modify sprinkler system.
Mt Si High School FLC Cooking Classroom
Contract Amount: $126,000
Modification including demolition and construction of new furred walls and finishes, new suspended ceiling system; included mechanical, plumbing, electrical, and modify sprinkler system.
Mt Si High School FLC Science Classroom
Contract Amount: $138,000
Modification including demolition and reconstruction of new walls and finishes, new window, new suspended ceiling system; included mechanical, plumbing, electrical, and modify sprinkler system and new dishwasher.
Canyon Creek & Skyview Jr. High Site Improvements
Contract Amount: $142,900
Overlay of existing parking lot and required striping, new concrete walks adjacent and upgrade and replacement of multiple portable ramps and storm systems.
Liberty High School Phase 3 Addition and Modernnization
Contract Amount: $20,292,418
A combination of 75,000 SF new construction and approximately 23,000 SF of remodel area.  Included replacing existing classrooms and library with 27 new classrooms and library, remodeling 5 science classrooms, 4 classrooms, 3 shop spaces, updating gymnasium acoustics, and miscellaneous exterior finish improvements and completing 6 tennis courts. Site work included trenching for utilities, parking and driveway paving and improving entry courts; a new storm water infrastructure installation.
Bothell High School Tech Ed Building TI
Contract Amount: $227,000
Renovation of existing ceiling spaces and electrical systems and related finishes and structure to accommodate new shop equipment.
John Marshall School Re-Opening
Contract Amount: $2,368,187
Remodel that included playground upgrades, ADA improvements, seismic/safety improvements, kitchen renovation, library renovation, classroom improvements, electrical, mechanical and plumbing upgrades.  
Snoqualmie Valley Middle School Stem Lab
Contract Amount: $60,363
Modification including demolition and construction of new furred walls and finishes, new suspended ceiling system; included mechanical, plumbing, electrical, and modify sprinkler system.
Snoqualmie Valley Middle School Gym FSK Replacement
Contract Amount: $29,948
Replace existing FSK sheeting at walls and ceilings of the gym.
Inglemoor Reservoir Pump Houses
Contract Amount: $5,082,365
Reservoir 1 improvements included removing caulking and seal weld all interior rafter to roof plate joints; install reservoir accessories; prepare and recoat damaged exterior; clean, fill and test reservoir.  Reservoir 2 repair damage rafters and replace damaged girders; restore roof plate profile; recoat interior and exterior; restore door sheet, clean, fill and test reservoir.  Construct new pump house building as well as storage building.
Snoqualmie Valley Middle School Courtyard Infill
Contract Amount: $1,314,650
5,900 SF building addition; demolition, site work, and reconstruction within existing courtyard including architectural, structural, mechanical, electrical and fire protection; install roof top HVAC unit and ductwork.
Skyview Junior High School Tenant Improvement
Contract Amount: $205,590
Modification to teacher planning rooms; installation of movable partition to choir room and adjacent common space; modifications to science prep room to create additional teacher planning space; miscellaneous finish and casework; relocation of computer lab to library space.
North Base Bus Garage Roofing Systems Replacement
Contract Amount: $5,570,666
Construction and replacement of HVAC systems and electrical system upgrades including replacement of multi-zone air handling units, gas fired rooftop heat recovery units, paint booth ventilation system and replacing existing water heating boilers.
Echo Glen Children's Center Units 1, 2, & 3 Renovations
Contract Amount: $6,217,057
Modernization of Residential Housing Units including addition to each unit, selective demolition to replace and rearrange toilet rooms, sleeping rooms. group rooms and offices.  Structural and building shell upgrades including roofing and concrete floor slabs; replace and expand electrical systems, furnace system. Window, hardware, lighting and finish upgrades; secure courtyard and fencing modifications.
Lindbergh High School
Site Improvements
Contract Amount: $2,079,166
Construct new utilities and electrical site lighting as well as landscaping and hardscape replacement including porous concrete walks and aprons surrounding and connecting existing buildings on the campus and appurtenance gates, fencing and retaining walls.
Duvall Library
Contract Amount: $3,727,081
Construction of new 8,291 SF library with green roof system and associated site development including 7,140 SF book stacks, reading room, children’s area, meeting room, restrooms, workroom, office, staff lounge, storage and study.  Upper level contains 1,151 SF mechanical, sprinkler, elevator and electrical rooms.  Site improvements include undergrounding of utilities, new parking area, concrete site stairs/ramps, landscaping, concrete wall terracing, sidewalk and street restoration.
Rainier Beach High School Athletic Field Improvements
Contract Amount: $959,243
Improvements to football, baseball, softball fields, and gymnasium building including, but not limited to removal and replacement of existing synthetic turf; repair, patch and clean elastic layer; modifications to existing bleachers and fencing; replacement of interior/exterior gymnasium lighting.
Queen Anne Elementary School Modernization
Contract Amount: $4,262,520
Including but not limited to interior demolition and refinishing as a result of extensive structural work, removal and installation of new mechanical, plumbing and electrical systems as established by Seattle Public Schools; upgrades to current education standards and handicap accessibility,
Woodin Elementary School Driveway Addition
Contract Amount: $88,622
Replace and add on to existing driveway, including force-main sewer line and striping, signage and sidewalk repair/replacement.
Lindbergh High School Building Improvements
Contract Amount: $1,489,137
Tenant improvements include replacing select exterior doors and window assemblies, providing new wood floor in gymnasium and refinishing of exiting gymnasium flooring; addition and renovation of the weight room and miscellaneous improvements.
Pierce County Main Jail HVAC System Replacement
Contract Amount: $3,788,925
Selective demo & disposal of interior/exterior walls, ceilings, windows, finishes, mechanical, electrical, security electronic systems, roof structures, mechanical equipment, and asbestos abatement.  New construction including concrete slab infills, walls, suspended ceilings; floor, wall and ceiling finishes, structural steel, and decking. HVAC replacement of air handling equipment; new mechanical air supply and exhaust; fire sprinkler; electrical power circuitry, lighting, extension of fire alarm; cable tray system and rough-in conduits for voice and data.
Skyview Junior High School Locker Room Modernization
Contract Amount: $13,870
Replace lockers and benches at existing locker rooms.
Mount Si High School
Wildcat Court
Contract Amount: $1,173,934
New 5,300 SF construction of Wildcat Court and all work associated with civil, structural, mechanical, electrical, fire protection and work and systems associated with the addition; new entrance, sandwich center and DECA café.   The new building was constructed within and existing courtyard approximately 50’ from the nearest outside wall of the existing occupied and operational high school, which presented unique challenges, such as craning in excavators, removing dirt with Georgia Buggies, and erecting steel off hours so that no hazards were presented to staff and students.